Country | Hungary, Ukraine |
---|---|
Coordinates |
47°13′28″N 19°34′48″E / 47.22444°N 19.58000°E 48°15′6″N 22°22′00″E / 48.25167°N 22.36667°E 49°23′11″N 24°14′57″E / 49.38639°N 24.24917°E 49°09′54″N 28°43′23″E / 49.16500°N 28.72306°E |
General direction | west–east |
From | Albertirsa, Hungary |
Passes through | Zakhidnoukrainska |
To | Vinnytsia, Ukraine |
Construction started | 1975 |
Commissioned | 1979 |
Type | Overhead transmission line |
Type of current | HVAC |
Total length | 479 km (298 mi) |
Power rating | 2,000 MW |
AC Voltage | 750 kV |
The Albertirsa–Zakhidnoukrainska–Vinnytsia powerline is a power transmission line between Ukraine and Hungary. It is a part of the former "Mir" transmission system between the Soviet Union and Comecon countries. As of today, it is the only 750 kV-powerline in Hungary and one of the few powerlines operated with this voltage in the European Union.
On 28 February 1974, the USSR, Bulgaria, Hungary, GDR, Poland and Czechoslovakia signed a cooperation agreement on construction of the 750 kV-line between Vinnytsia and Albertirsa, and substations Vinnytsia, Zakhidnoukrainska and Albertirsa. Construction started in 1975 and it went in service in 1979.
Since the synchronization of the power grid of Hungary with that of the synchronous grid of Continental Europe (ENTSO-E) and because of economic reasons, the powerline went out of service in 1993, but was put in service again in 2002 after some new equipment was installed.
The 479-kilometre (298 mi) long power line connects the substation of Albertirsa in Hungary with Zakhidnoukrainska substation, which is situated east of Borodczyce in Ukraine. It uses as suspension pylons portal pylons. These are free-standing structures in areas, which are sometimes flooded and guyed in areas without flood-danger. As anchor pylons towers with one crossbar are used whereby the conductor is led around the pylon structure. The powerline was designed for the transmission of 2,000 MW electricity.