Arona–Novara railway
| Arona–Novara railway |
| Overview |
| Type |
Heavy rail |
| Status |
in use |
| Locale |
Piedmont, Italy
|
| Termini |
Arona Novara
|
| Operation |
| Opened |
14 June 1855 (1855-06-14)
|
| Owner |
RFI |
| Operator(s) |
Trenitalia |
| Technical |
| Line length |
105 km (65 mi) |
| Track gauge |
1,435 mm (4 ft 8 1⁄2 in) |
|
Route map
|
|
|
|
|
|
| Domodossola–Milan railway |
| from Domodossola |
|
|
|
100.769 |
Arona |
205 m |
|
|
|
| Domodossola–Milan railway |
| to Milan |
|
|
|
97.515 |
Dormelletto Paesesince 1935
|
227 m |
|
|
|
| Santhià–Arona railway |
| to Santhià |
|
|
|
92.540 |
Borgo Ticino |
270 m |
|
|
89.687 |
Varallo Pombia |
292 m |
|
|
85.151 |
Marano Ticino |
258 m |
|
|
|
| Luino–Oleggio railway |
| from Luino |
|
|
|
81.616 |
Oleggio |
235 m |
|
|
78.121 |
Bellinzago |
216 m |
|
|
76.871 |
P.M. Cameri
|
|
|
|
| Domodossola–Novara railway |
| from Domodossola |
;
| Varallo–Novara railway |
| from Varallo |
|
|
|
68.303 |
Vignale |
160 m |
|
|
|
Turin–Milan high-speed railway |
|
|
|
| Biella–Novara railway |
| from Biella |
;
| Turin–Milan railway |
| from Turin |
|
|
|
65.028 |
Novara |
151 m |
|
|
|
| Novara–Alessandria railway |
| to Alessandria |
/
| Turin–Milan railway |
| to Milan |
|
|
|
|
The Arona–Novara railway is a railway line in Piedmont, Italy. It was opened on 14 June 1855.
...
Wikipedia