*** Welcome to piglix ***

Bossley Park High School

Bossley Park High School
Bossley Park High School emblem.png
Location
Sydney, NSW
Australia
Coordinates 33°52′13″S 150°52′30″E / 33.87028°S 150.87500°E / -33.87028; 150.87500Coordinates: 33°52′13″S 150°52′30″E / 33.87028°S 150.87500°E / -33.87028; 150.87500
Information
Type Public, Secondary School
Motto Focussing on Excellence and Success
Established 1988
Principal Vera Chevell
Grades 7–12
Number of students 1473 (2010)
School colour(s) White and Black
Website

Bossley Park High School (abbreviated as BPHS) is located in the Bossley Park, New South Wales, Australia. It is a coeducational comprehensive high school serving the rapidly developing suburbs of Bossley Park and Abbotsbury in western Sydney. In 2010, the school was made up of over 1473 students, each from Years 7 to 12, and is one of the largest schools in the state. The school was established in 1988 and provides a functional and practical learning environment with access to facilities required for all facets of the curriculum.

In 1999, it was revealed by the Sunday Telegraph, that it was the richest state high school which had a bank balance of more $700,000. In 2004, The Herald revealed the school had more than $1 million in reserves.

Bossley Park High School is built on land that was formerly producing fruits, vegetables, flowers and poultry products, a site of almost seven hectares. Planning for the new school began in 1985 and White Industries Pty Ltd, was the company in charge for the construction. The contract price for the construction was almost $8,000,000, but, including the costs of the land and the furnishing of the buildings the final cost came to approximately $10,000,000. The school was established in 1988 with a small year 7 enrolment of 125 students. The first appointed principal was Mr Brian Jux and his successor by Ian Parnaby, served for 12 years before retiring in 2013. Michelle Wood was the second latest principal, with Mrs Chevell as the latest principal.

As part of the school's ongoing asset acquisition program, the library, all computer rooms, the drama room and staff rooms are air conditioned. The school is acclaimed with a quick adaptation to new technologies, putting it up to 5 years ahead of other public schools. The school has a sophisticated student computer system, and also has interactive whiteboards in a few of its classrooms. The food labs were upgraded to industry standards to facilitate the vocational education and training course hospitality operations. A concrete court was laid so that students with physical disabilities had an area where they could play sports such as wheelchair rugby. In mid-2007, a shelter was built in order to shelter it from rain.

In 2008 major renovations continued including three water tanks, holding 315,000 litres, buried on the school grounds to keep the oval in good condition. A shelter has been built over the basketball courts to catch the rain, which then flows into the tanks, to be used for irrigation. Project on a new performance center, to be completed by March 2010, would also be hooked up to the tanks.This is the start of the school's water and energy saving plans. The school aims to have solar power generators installed on the performance centre. It is estimated to cut down $3000 per month on water bills.


...
Wikipedia

...