*** Welcome to piglix ***

Changping line

Changping line
 Changping 
北京地铁沙河站.JPG
Overview
Other name(s) M27 (planned name)
Line 27
Type Rapid transit
System Beijing Subway
Status Operational
Termini Xi'erqi
Changping Xishankou
Stations 12
Daily ridership 157,100 (2014 Avg.)
238,000 (2016 Peak)
Operation
Opened 30 December 2010(Phase I)
26 December 2015(Phase II)
Operator(s) Beijing Mass Transit Railway Operation Corp., Ltd
Technical
Line length 31.9 km (19.8 mi)
Track gauge 1,435 mm (4 ft 8 12 in)
Operating speed 100 km/h (maximum service speed)
Route map
[{{fullurl:{{{1}}}|action=edit}}    ]
Changping Xishankou
[{{fullurl:{{{1}}}|action=edit}}    ]
Ming Tombs
[{{fullurl:{{{1}}}|action=edit}}    ]
Changping
[{{fullurl:{{{1}}}|action=edit}}    ]
Changping Dongguan
[{{fullurl:{{{1}}}|action=edit}}    ]
Beishaowa
[{{fullurl:{{{1}}}|action=edit}}    ]
Nanshao
[{{fullurl:{{{1}}}|action=edit}}    ]
Shahe University Park
[{{fullurl:{{{1}}}|action=edit}}    ]
Shahe
[{{fullurl:{{{1}}}|action=edit}}    ]
Gonghuacheng
Line 8, Changping line
[{{fullurl:{{{1}}}|action=edit}}    ]
[{{fullurl:{{{1}}}|action=edit}}    ]
Zhuxinzhuang
[{{fullurl:{{{1}}}|action=edit}}    ]
Life Science Park
Line 13, Changping line
[{{fullurl:{{{1}}}|action=edit}}    ]
[{{fullurl:{{{1}}}|action=edit}}    ]
Xi'erqi

The Changping Line of the Beijing Subway (Chinese: 北京地铁昌平线; pinyin: běijīng dìtiě chāngpíng xiàn) is a half elevated, half underground rapid transit line in northern Beijing. The line started construction in 2009. In September 2010, Construction of Phase I was completed, and was followed by three-month test run. Phase I of the line opened on December 30, 2010 and ran north from the Xi'erqi station on Line 13 to Nanshao. On December 26, 2015, Phase II of the line opened, extending the line northwards to the Thirteen Tombs Scenic Area and terminating at Changping Xishankou station. It now connects the central Changping District with the Beijing subway network.

During rush hours, the section between Life Science Park and Xi'erqi Stations is the most congested section in the Beijing subway network, operating at 132% capacity.

The Changping Line runs parallel and to the east of the Badaling Expressway, passing near the townships of Shahe and Nanshao.

A south extension beyond the current southern terminus of Xi'erqi has been proposed.

Xi'erqi (Line 13)

Qinghe Railway Station (Line 13)

Shangqingqiao

Xueqinglu

Liudaokou (Line 15)

Xueyuanqiao

Xitucheng (Line 10)

Jimenqiao (Line 12 & Line 9)

The south extension is planned to be completed by 2020.

The planned route of the Changping Line was chosen from three alternatives. The other original options placed the southern terminus of the line at the Beijing North Railway Station near Line 2 at Xizhimen and at Huoying, with transfers not only to Line 8 but to Line 13 as well. One original alternative plan set Phase II at 16.7 km with one extra station beyond the Ming Tombs.

On January 5, 2009, the Changping District government signed land clearing contracts with townships along route, Huilongguan, Shahe and Nanshao, marking the official beginning of Phase I construction. Phase I was set to be completed by the end of 2010, and Phase II is scheduled for completion by 2012.


...