|
Cheongnyangni Station
|
|
|---|---|
| Korean name | |
| Hangul | |
| Hanja | |
| Revised Romanization | Cheongnyangni-yeok |
| McCune–Reischauer | Ch'ŏngnyangni-yŏk |
| General information | |
| Location | 620-69 Jeonnong-dong, 205 Wangsanno Jiha, Dongdaemun-gu, Seoul |
| Coordinates | 37°34′48″N 127°02′42″E / 37.58000°N 127.04500°ECoordinates: 37°34′48″N 127°02′42″E / 37.58000°N 127.04500°E |
| Operated by | Seoul Metro, Korail |
| Line(s) |
Line 1 Gyeongui–Jungang Line |
| Platforms | 4 |
| Tracks | 8 |
| Key dates | |
| August 15, 1974 | Line 1 opened |
| October 15, 1911 | Gyeongui–Jungang Line opened |
| Traffic | |
| Passengers | (Daily) Based on Jan-Dec of 2012. KR: 11,782 Line 1: 66,305 Jungang Line: 26,488 |
Cheongnyangni Station (청량리역) is a station of Seoul Subway Line 1 and the Gyeongui-Jungang Line and it is a Seoul terminus of passenger trains serving the eastern part of South Korea. The Gyeongchun Line will be extended from Sangbong Station to Cheongnyangni Station in September 2016, offering a transfer to Line 1, although only some subway cars will operate till there, with others terminating at Sangbong. A physical transfer between underground and aboveground stations opened on 20 August 2010.
Passenger trains serving the following Korail lines terminate at Cheongnyangni Station:
In addition, this station is served by all ITX trains to/from Chuncheon Station on the Gyeongchun Line. However, the majority of trains do not terminate at this station but continue to Yongsan Station.