Fahrettin Altay
|
||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Tram İzmir station | ||||||||||||||||
Location | Ş. B. Ali Resmi Tufan Cd., Mehmet Ali Akman Mah., 35330 Konak |
|||||||||||||||
Coordinates | 38°23′54″N 27°04′09″E / 38.3982°N 27.0693°ECoordinates: 38°23′54″N 27°04′09″E / 38.3982°N 27.0693°E | |||||||||||||||
Owned by | İzmir Metropolitan Municipality | |||||||||||||||
Operated by | İzmir Metro A.Ş. | |||||||||||||||
Line(s) | ||||||||||||||||
Connections |
İzmir Metro at F. Altay ESHOT Bus: 5, 6, 7, 8, 10, 17, 24, 25, 82, 167, 169, 305, 311, 320, 321, 480, 486, 510, 551, 554, 581, 671, 690, 725, 730, 735, 736, 879, 916, 945, 950, 969, 971 |
|||||||||||||||
Construction | ||||||||||||||||
Disabled access | Yes | |||||||||||||||
History | ||||||||||||||||
Opened | January-February 2018 (Expected) | |||||||||||||||
Electrified | 750V DC OHLE | |||||||||||||||
Services | ||||||||||||||||
|
Fahrettin Altay is an under construction light-rail station on the Konak Tram of the Tram İzmir system in İzmir, Turkey. Located along Şehit Babası Ali Resmi Tufan Avenue, near Fahrettin Altay Square, it is the western terminus of the line. Connection to the İzmir Metro will be available at Fahrettin Altay station.
Fahrettin Altay is expected to open by February 2018.
ESHOT operates city bus service on İnönü Avenue.