Gentilly Nuclear Generating Station | |
---|---|
The Gentilly-2 (left) and Gentilly-1 (right)
nuclear generating stations |
|
Official name | Centrale nucléaire de Gentilly |
Country | Canada |
Location | Bécancour, Quebec |
Coordinates | 46°23′45″N 72°21′25″W / 46.39583°N 72.35694°WCoordinates: 46°23′45″N 72°21′25″W / 46.39583°N 72.35694°W |
Status | Shut down pending safe storage |
Construction began | 1973 |
Commission date | October 1, 1983 |
Decommission date | December 28, 2012 |
Construction cost | CAD 1.3 billion |
Owner(s) | Hydro-Québec |
Operator(s) | Hydro-Québec |
Nuclear power station | |
Reactor type | CANDU |
Reactor supplier | Atomic Energy of Canada Limited |
Power generation | |
Units operational | None |
Units decommissioned | 1 x 250 MW 1 x 675 MW |
Nameplate capacity | 925 MW |
Capacity factor | 76.4% |
Annual gross output | 3,491 GW·h |
Website Hydro-Québec: Gentilly-2 |
Gentilly Nuclear Generating Station (Centrale nucléaire de Gentilly in French) is a formerly operational Canadian nuclear power station located on the south shore of the St. Lawrence River in Bécancour, Quebec, 100 km north east of Montreal.
The Gentilly site contains the only nuclear power reactors in Quebec and comprises two nuclear reactors; Gentilly-1, a 250 MW CANDU-BWR prototype, was marred by technical problems and shut down in 1977, and Gentilly-2, a 675-MW CANDU-6 reactor operated commercially by the government-owned public utility Hydro-Québec between 1983 and 2012.
The Gentilly reactors were constructed in stages between 1966 and 1983 and were originally part of a plan for 30-35 nuclear reactors in Quebec. A third reactor, Gentilly-3, was scheduled to be built on the same site but was cancelled because of a drop in demand growth in the late 1970s.
In October 2012, it was decided for economical reasons not to proceed with the refurbishment of Gentilly-2 and decommission the power plant instead, a process that will take approximately 50 years to complete. In December of that same year, the remaining reactor was shut down and the decommissioning process started.
Gentilly-1 was a prototype CANDU-BWR reactor, based on the SGHWR design. It was designed for a net output of 250MW(e). The reactor had several features unique amongst CANDU reactors, including vertically oriented pressure tubes (allowing for the use of a single fuelling machine below the core), and light-water coolant. These features were intended to reduce the cost and complexity of the unit, again to make it an attractive export unit. However, the design was not successful, and over nearly 7 years recorded only 180 on-power days. Gentilly-1 is no longer in operation.
Gentilly-2 is a standard CANDU 6 reactor, similar to the Point Lepreau Nuclear Generating Station. The CANDU 6 is a successful reactor type, and has been exported to South Korea, Argentina, Romania and China. The plant has a net output of 675MW(e). Unlike the adjacent Gentilly-1 reactor, Gentilly-2 has had a good service record since start-up in 1982, with a cumulative operating factor of 76.4%. In an August 19, 2008 announcement, Québec planned to spend $1.9B to overhaul Gentilly-2 in order to extend its lifespan to 2040. Refurbishment of the reactor was eventually cancelled when on the 3rd of October 2012, Hydro-Quebec's CEO, Thierry Vandal, announced the decommissioning of the Gentilly-2 generating station for economic reasons, scheduled to occur on December 28, 2012 at 10:30 p.m. At that time, a decommissioning process will proceed over a period of 50 years and is expected to cost $1.8 billion. The permanent shut down and decommissioning of the power plant followed an election pledge from Quebec premier, Pauline Marois.