*** Welcome to piglix ***

German submarine U-325

History
Nazi Germany
Name: U-325
Ordered: 16 July 1942
Builder: Flender Werke, Lübeck
Yard number: 325
Laid down: 13 April 1943
Launched: 25 March 1944
Commissioned: 6 May 1944
Fate: Sunk, April 1945
General characteristics
Class and type: Type VIIC/41 submarine
Displacement:
  • 759 tonnes (747 long tons) surfaced
  • 860 t (846 long tons) submerged
Length:
Beam:
  • 6.20 m (20 ft 4 in) o/a
  • 4.70 m (15 ft 5 in) pressure hull
Height: 9.60 m (31 ft 6 in)
Draught: 4.74 m (15 ft 7 in)
Installed power:
  • 2,800–3,200 PS (2,100–2,400 kW; 2,800–3,200 bhp) (diesels)
  • 750 PS (550 kW; 740 shp) (electric)
Propulsion:
Speed:
  • 17.7 knots (32.8 km/h; 20.4 mph) surfaced
  • 7.6 knots (14.1 km/h; 8.7 mph) submerged
Range:
  • 8,500 nmi (15,700 km; 9,800 mi) at 10 knots (19 km/h; 12 mph) surfaced
  • 80 nmi (150 km; 92 mi) at 4 knots (7.4 km/h; 4.6 mph) submerged
Test depth:
  • 250 m (820 ft)
  • Crush depth: 275–325 m (902–1,066 ft)
Complement: 4 officers, 40–56 enlisted
Armament:
Service record
Part of:
Identification codes: M 14 343
Commanders:
  • Oblt.z.S. Erwin Dohrn
  • 6 May 1944 – 20 April 1945
Operations:
  • 1st patrol: 1–4 December 1944
  • 2nd patrol: 9 December 1944 – 14 February 1945
  • 3rd patrol: 20 March – 20 April 1945
Victories: None

German submarine U-325 was a Type VIIC/41 U-boat of Nazi Germany's Kriegsmarine during World War II.

The submarine was laid down on 13 April 1943 at the Flender Werke at Lübeck, launched on 25 March 1944, and commissioned on 6 May 1944 under the command of Oberleutnant zur See Erwin Dohrn.

German Type VIIC/41 submarines were preceded by the heavier Type VIIC submarines. U-325 had a displacement of 759 tonnes (747 long tons) when at the surface and 860 tonnes (850 long tons) while submerged. She had a total length of 67.10 m (220 ft 2 in), a pressure hull length of 50.50 m (165 ft 8 in), a beam of 6.20 m (20 ft 4 in), a height of 9.60 m (31 ft 6 in), and a draught of 4.74 m (15 ft 7 in). The submarine was powered by two Germaniawerft F46 four-stroke, six-cylinder supercharged diesel engines producing a total of 2,800 to 3,200 metric horsepower (2,060 to 2,350 kW; 2,760 to 3,160 shp) for use while surfaced, two Garbe, Lahmeyer & Co. RP 137/c double-acting electric motors producing a total of 750 metric horsepower (550 kW; 740 shp) for use while submerged. She had two shafts and two 1.23 m (4 ft) propellers. The boat was capable of operating at depths of up to 230 metres (750 ft).


...
Wikipedia

...