Greasbrough Canal | |
---|---|
The canal above the A633 culvert
|
|
Specifications | |
Locks | 4 |
Status | part extant |
History | |
Date of act | Privately built |
Date of first use | 1780 |
Date closed | 1918 |
Geography | |
Start point | Greasbrough |
End point | Rotherham |
Connects to | River Don Navigation |
The Greasbrough Canal was a private canal built by the Marquess of Rockingham to serve his coal mining interests in and around the village of Greasbrough, near Rotherham, South Yorkshire, England. It opened in 1780, and the Newbiggin branch was built some time later. The main line to Greasbrough closed in 1840 with the coming of the Sheffield and Rotherham Railway, and the canal ceased to carry commercial traffic during the First World War. Most of it has been filled in, but a small section near the River Don Navigation remains in water.
Collieries to the south of Wentworth Park and near Bassingthorpe had been connected to the River Don Navigation by a waggonway, which had been completed by 1762. In order to improve transport of the coal, the Marquess of Rockingham asked John Varley to survey a route from the Don to either Cinder Bridge or Sough Bridge near Greasbrough. Varley was an assistant to the canal engineer James Brindley. Varley's proposal was for a 1.5-mile (2.4 km) canal, which would require three locks, as there was a fall of around 25 feet (7.6 m) over the route. His survey, which is in the Sheffield Archives Office, was judged to be good by the engineer John Smeaton, but he thought that the scheme lacked an adequate water supply. No action was taken, and Smeaton was asked to re-survey the route in 1775. He suggested using five locks, rather than three, and estimated the cost of the project to be £5,952, which included £2,500 for the locks. Again, no action was taken, but a third survey was commissioned in 1778, this time by William Fairbank. The engineer William Jessop was then asked to construct the canal. He reduced the number of locks to four, and included a reservoir for water supply. Work began in 1779, and was probably completed the following year. Cinder Bridge was the main terminus, but Sough Bridge was served by a short branch. Tramways connected the canal to the collieries, which were leased from the Marquess by the Fentons.