Höllentalbahn (Black Forest)
Höllentalbahn Hell Valley Railway
|
|
| Technical |
| Line length |
74.7 km (46.4 mi) |
| Track gauge |
1,435 mm (4 ft 8 1⁄2 in) |
| Electrification |
1936 until 1960, 20 kV, 50 Hz, AC
since 1960, 15 kV, 16⅔ Hz, AC
|
| Operating speed |
100 km/h |
| Highest elevation |
607 m (1,991 ft) |
| Maximum incline |
5.5% |
| Rack system |
1887 until 1933; now adhesion
|
|
Route map
|
 |
|
| Stations, junctions and heights above sea level |
|
|
|
Rhine Valley Railway from Mannheim |
|
|
−2,0 |
Freiburg (Breisgau) Hbf. |
278 m |
|
|
|
|
|
|
0 |
Branch point(replaced by a new route in 1934)
|
|
|
|
Rhine Valley Railway to Basel |
|
|
|
|
|
|
|
Loretto Tunnel514 m
|
|
|
|
Sternwald Tunnel302 m
|
|
|
2,7 |
Freiburg Wiehre
|
280 m |
|
|
|
|
|
|
5,7 |
Freiburg Littenweiler
|
317 m |
|
|
7,4 |
Kappelertalnow closed
|
|
|
11,0 |
Kirchzarten |
392 m |
|
|
13,9 |
Himmelreich |
455 m |
|
|
|
Falkenstein Tunnel72 m
|
|
|
|
Lower Hirschsprung Tunnel121 m
|
|
|
|
Upper Hirschsprung Tunnel69 m
|
|
|
18,2 |
Hirschsprungnow closed
|
559 m |
|
|
|
Kehre Tunnel203 m
|
|
|
20,6 |
Posthaldenow closed
|
657 m |
|
|
22,2 |
Höllsteignow closed
|
740 m |
|
|
|
Ravenna Bridge224 m
|
|
|
|
Ravenna Tunnel47 m
|
|
|
|
Finsterrank Tunnel248 m
|
|
|
|
Löffel Valley Tunnel82 m
|
|
|
25,4 |
Hinterzarten |
885 m |
|
|
29,3 |
Titisee |
858 m |
|
|
|
Dreiseenbahn to Seebrugg |
|
|
32,3 |
Hölzlebrucknow closed
|
|
|
29,3 |
Neustadt (Schwarzwald) |
805 m |
|
|
39,1 |
Kappel Gutachbrücke ()now closed
|
|
|
|
Branch line to Bonndorf
|
|
|
|
Gutach Valley Bridge ()
|
|
|
|
Finsterbühl Tunnel166 m
|
|
|
|
Hörnle Tunnel220 m
|
|
|
... Wikipedia
...
| |