Hasanağa Parkı
|
||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
İzmir Metro rapid transit station | ||||||||||||||||
Location | Erdem Cd., Adatepe Mah., 35160 Buca |
|||||||||||||||
Coordinates | 38°22′55″N 27°10′57″E / 38.3820°N 27.1824°ECoordinates: 38°22′55″N 27°10′57″E / 38.3820°N 27.1824°E | |||||||||||||||
Owned by | İzmir Metropolitan Municipality | |||||||||||||||
Operated by | İzmir Metro A.Ş. | |||||||||||||||
Line(s) | ||||||||||||||||
Tracks | 2 | |||||||||||||||
Construction | ||||||||||||||||
Disabled access | Yes | |||||||||||||||
History | ||||||||||||||||
Opened | 2022 | (expected)|||||||||||||||
Services | ||||||||||||||||
|
Hasanağa Parkı is a proposed underground station on the Üçyol—Çamlıkule Line of the İzmir Metro. It will be located beneath Erdem Avenue in Buca. Construction of the station, along with the metro line, is expected to begin in 2018.
Hasanağa Parkı station is expected to open in 2022.