Hoping Power Plant | |
---|---|
![]() |
|
Official name | 和平電廠 |
Country | Republic of China |
Location | Xiulin, Hualien County, Taiwan |
Coordinates | 24°18′24″N 121°45′50″E / 24.30667°N 121.76389°ECoordinates: 24°18′24″N 121°45′50″E / 24.30667°N 121.76389°E |
Status | Operational |
Commission date | June 2002 (Unit 1) September 2002 (Unit 2) |
Owner(s) | Ho-Ping Power Company |
Thermal power station | |
Primary fuel | Coal |
Power generation | |
Nameplate capacity | 2 X 660 MW |
The Hoping Power Plant (Chinese: 和平電廠; pinyin: Hépíng Diànchǎng) is a coal-fired power plant in Xiulin Township, Hualien County, Taiwan. With the installed capacity of 1,320 MW, the power plant is the fourth largest coal-fired power plant in Taiwan.
Electricity generated by the power plant supplies the major load located in north of Taiwan.
The power plant is fully owned by Ho-Ping Power Company. The equity interest is divided to CLP Group (20%), Mitsubishi Corporation (20%) and Taiwan Cement Corporation (60%).
On 29 July 2017, a transmission tower for the outgoing lines of the plant collapsed due to Typhoon Nesat which caused the electricity supply to Taiwan down by 4%. The tower was reconstructed on 11 August 2017 and completed in the following day, which became the fastest power line reparation in the history of Taiwan. On 13 August, the plant resumed its operation and reached its full generating capacity the day after.
On 15 August 2017, the plant tripped due to the break down of one of its generator causing a loss of 650 MW power generation.
Hoping Power Plant is accessible within walking distance North East from TRA Heping Station.