|
Akihabara Station
秋葉原駅 |
|
|---|---|
|
The Akihabara Electric Town entrance of Akihabara Station in February 2015
|
|
| Location | 1 Soto-Kanda (JR Station) Kanda-Sakuma-chō (Tokyo Metro) Kanda-Hanaoka-chō (Tsukuba Express) Chiyoda, Tokyo Japan |
| Operated by | |
| Line(s) |
|
| Connections | Bus terminal |
| History | |
| Opened | 1890 |
| Location | |
|
AKB
JK
28
JY
03
JB
19 Akihabara Station 秋葉原駅 |
|
|---|---|
|
JR Akihabara Station Showa Dori Entrance in January 2016
|
|
| Location | 1 Soto-Kanda, Chiyoda city, Tokyo Japan |
| Operated by |
|
| Line(s) | |
| Platforms |
|
| Connections | Bus terminal |
| Other information | |
| Station code |
|
| Website | www |
| History | |
| Opened | 1890 |
|
H
15 Akihabara Station 秋葉原駅 |
|
|---|---|
|
Tokyo Metro Hibiya Line No. 3 Entrance in December 2006
|
|
| Location | Kanda-Sakuma-chō Chiyoda, Tokyo Japan |
| Operated by | Tokyo Metro |
| Line(s) | H Tokyo Metro Hibiya Line |
| Connections | Bus terminal |
| History | |
| Opened | 1962 |
|
Akihabara Station
秋葉原駅 |
|
|---|---|
|
The Tsukuba Express platform
|
|
| Location | Kanda-Hanaoka-chō Chiyoda, Tokyo Japan |
| Operated by | Metropolitan Intercity Railway Company |
| Line(s) | Tsukuba Express |
| Connections | Bus terminal |
| History | |
| Opened | 24 August 2005 |
Coordinates: 35°41′54″N 139°46′25″E / 35.698240°N 139.773731°E
Akihabara Station (秋葉原駅? Akihabara-eki) is a railway station in Tokyo's Chiyoda ward. It is at the center of the Akihabara shopping district specializing in electronic goods.
Akihabara Station is served by the following lines. JR East:
Metropolitan Intercity Railway Company:
The above-ground section of the station is cross-shaped, with the Chūō-Sōbu Line tracks running from east to west, and the Yamanote and Keihin-Tohoku Line (and Tohoku Shinkansen, which does not stop at Akihabara) from north to south.
There are two island platforms serving four tracks for the Yamanote Line and the Keihin-Tohoku Line on the 2nd level, and two side platforms serving two tracks for the Sobu Line Local service on the 4th level.
Chest-high platform edge doors were installed on the Yamanote Line platforms in May 2015, to be brought into operation from 20 June 2015.