| Line 1 (Etxebarri – Plentzia) | |||
|---|---|---|---|
|
Schematic drawing of Line 1.
|
|||
| Overview | |||
| Locale | Etxebarri, Bilbao, Erandio, Leioa, Getxo, Berango, Sopelana, Urduliz and Plentzia | ||
| Stations | 28 | ||
| Operation | |||
| Opened | November 11, 1995 | ||
| Operator(s) | Metro Bilbao S.A. | ||
| Technical | |||
| Line length | 31 km (19 mi) | ||
| Track gauge | 1,435 mm (4 ft 8 1⁄2 in) standard gauge | ||
| |||