Line 1 | |
---|---|
![]() |
|
![]() A train in Torrent Avinguda
|
|
Overview | |
Type | Rapid transit |
System | Metrovalencia |
Status | Active |
Locale | Valencia, Spain |
Termini |
Llíria / Bétera Torrent Av. / Villanueva de Castellón |
Stations | 59 |
Operation | |
Opened | 1988 |
Owner | Generalitat Valenciana |
Operator(s) | FGV |
Rolling stock | 59 trains |
Technical | |
Line length | 98.2 km (61.02 mi) |
Track gauge | 1,000 mm (3 ft 3 3⁄8 in) metre gauge |
Operating speed | 80 km/h (50 mph) |