| Line 1 | |
|---|---|
|
A train in Torrent Avinguda
|
|
| Overview | |
| Type | Rapid transit |
| System | Metrovalencia |
| Status | Active |
| Locale | Valencia, Spain |
| Termini |
Llíria / Bétera Torrent Av. / Villanueva de Castellón |
| Stations | 59 |
| Operation | |
| Opened | 1988 |
| Owner | Generalitat Valenciana |
| Operator(s) | FGV |
| Rolling stock | 59 trains |
| Technical | |
| Line length | 98.2 km (61.02 mi) |
| Track gauge | 1,000 mm (3 ft 3 3⁄8 in) metre gauge |
| Operating speed | 80 km/h (50 mph) |