*** Welcome to piglix ***

Line 3, Wuhan Metro

Line 3, Wuhan Metro
 3 
Hongtu Boulevard Station 04.jpg
A train at Hongtu Boulevard station in December 2015
Overview
Type Rapid transit
System Wuhan Metro
Status Operating
Locale Wuhan, China
Termini Hongtu Boulevard
Zhuanyang Boulevard
Stations 24
Services 1
Operation
Opened December 28, 2015
Owner Government of Wuhan
Operator(s) Wuhan Metro Group Co., Ltd.
Character Underground
Rolling stock Chinese Type B
Technical
Line length 33.2 km (20.63 mi)
Number of tracks 2
Track gauge 1,435 mm (4 ft 8 12 in)

The Line 3 of Wuhan Metro (Chinese: 武汉地铁三号线) is the first underground metro line crossing the Han River. This line crosses five districts of Wuhan: Jiang'an District, Jianghan District, Qiaokou District, Hanyang District and Hannan District (Wuhan Economic-Technological Zone, WEDZ). It started operation on December 28, 2015.

On February 23, 2012, National Development and Reform Commission approved all construction of Line 3 and construction started on March 31. All tunnels of Line 3 were finished on October 8, 2015, and all tracks were finished on October 28, 2015. It started operation on December 28, 2015.

The first train of Line 3 arrived on March 25, 2015.


...
Wikipedia

...