| Lizhou Dam | |
|---|---|
|
Location of Lizhou Dam in China
|
|
| Country | China |
| Location | Muli Tibetan Autonomous County, Sichuan Province |
| Coordinates | 28°5′23.69″N 100°56′2.70″E / 28.0899139°N 100.9340833°ECoordinates: 28°5′23.69″N 100°56′2.70″E / 28.0899139°N 100.9340833°E |
| Purpose | Power |
| Status | Reservoir impounding |
| Construction began | 2009 |
| Opening date | 2015 |
| Dam and spillways | |
| Type of dam | Arch, roller-compacted concrete |
| Impounds | Muli River |
| Height | 132 m (433 ft) |
| Width (crest) | 7 m (23 ft) |
| Width (base) | 26 m (85 ft) |
| Reservoir | |
| Total capacity | 186,900,000 m3 (151,500 acre·ft) |
| Catchment area | 8,603 km2 (3,322 sq mi) |
| Surface area | 4.97 km2 (1.92 sq mi) |
| Power station | |
| Name | Lizhou Hydropower Plant |
| Coordinates | 27°58′46.35″N 101°0′11.09″E / 27.9795417°N 101.0030806°E |
| Commission date | 2016 (est.) |
| Type | Conventional, diversion |
| Hydraulic head | 177 m (581 ft) |
| Turbines | 3 x 115 MW, 2 x 5 MW Francis-type |
| Installed capacity | 355 MW |
The Lizhou Dam is a arch dam on the Muli River in Muli Tibetan Autonomous County, Sichuan Province, China. The primary purpose of the dam is hydroelectric power generation and when commissioned it will support a 355 MW power station. Water from the dam will be sent to a power station about 14.5 km (9.0 mi) to the southeast. The difference in elevation between the reservoir and power station will afford a hydraulic head (water drop) of 177 m (581 ft). Preliminary construction on the project began in 2009 and the superstructures were approved in 2011. Pouring of roller-compacted concrete for the dam began in 2012. The dam began to impound its reservoir in December 2015.