M6 Toll | |
---|---|
![]() |
|
![]() |
|
Route information | |
Part of ![]() |
|
Length | 27 mi (43 km) |
Existed | 2002 – present |
Major junctions | |
From | Coleshill |
![]() M6 motorway ![]() M42 motorway |
|
To | Cheslyn Hay, Great Saredon |
Location | |
Primary destinations |
Cannock, Brownhills, Lichfield, Shenstone, Tamworth, Burntwood |
Road network | |
The M6 Toll, also called the Birmingham North Relief Road (BNRR), connects M6 Junction 3a at the Coleshill Interchange to M6 Junction 11A at Wolverhampton with 27 miles (43 km) of six-lane motorway.
The M6 Toll is the only major toll road in Great Britain, and has two payment plazas, Great Wyrley Toll Plaza for northbound and Weeford Toll Plaza for southbound. The northbound toll plaza is situated between junctions T6 and T7, and the southbound between junctions T4 and T3. The weekday cash cost is £5.90 for a car and £11.00 for a Heavy Goods Vehicle.
The M6 Toll is part of the (unsigned in the UK) E-road E05 and is subject to the same regulations and policing as other motorways in the UK. It has one service station along its 27-mile stretch, Norton Canes services.
Proposals for a new publicly funded motorway were circulated in 1980. It was originally called the Birmingham North Relief Road (BNRR) and designed to alleviate the increasing congestion on the M6 through Birmingham and the Black Country in England. This was the busiest section of the M6, carrying up to 180,000 vehicles per day when it was designed to carry only 72,000.
Five alternative routes were put for consultation in 1980 and a preferred route was published in 1986. In 1989 there was a public inquiry relating to a publicly funded motorway.
In 1989 it was announced that it would be built privately and a competition took place which was won by Midland Expressway Ltd in 1991. The contract was for a 53-year concession to build and operate the road as an early form of public private partnership with the operator paying for the construction and recouping its costs by setting and collecting tolls, allowing for a 3-year construction period followed by 50 years of operation. At the end of this period the infrastructure would be returned to the Government. Toll rates are set at the discretion of the operator at six-monthly intervals and there is no cap on the rates charged.