| Rapid transit / Metro | ||||||||||||
| Owned by | Rapid MetroRail Gurgaon Ltd. (RMGL) | |||||||||||
| Operated by | Rapid MetroRail Gurgaon | |||||||||||
| Platforms |
|
|||||||||||
| Tracks | 2 | |||||||||||
| Construction | ||||||||||||
| Structure type | Elevated | |||||||||||
| Platform levels | 2 | |||||||||||
| History | ||||||||||||
| Opened | 14 November 2013 | |||||||||||
| Electrified | 750 V, DC via third rail | |||||||||||
| Services | ||||||||||||
|
||||||||||||
Platform-1 →
Phase 3 is a station of the Rapid MetroRail Gurgaon opened in November 2013.