*** Welcome to piglix ***

Remington Centre

Remington Centre Mall
Remington Centre Logo.png
Location Markham, Ontario, Canada
Opening date Unknown
Developer Remington Group
Management Remington Group
Owner Remington Group
Architect Kohn Partnership Architects Inc. and Markham's Green Development
No. of stores and services 700
No. of floors 3
Website remingtoncentre.ca

Remington Centre (滙通廣場) is an 800,000-square-foot (74,000 m2) Chinese-themed mall to be built at the corner of Kennedy Road and Steeles Avenue in Markham, Ontario, Canada, on the site of the present Market Village mall. It will be connected to Pacific Mall by an indoor walkway. Market Village is scheduled for demolition and construction of the new mall was to have begun in the third quarter of 2013, but as of early 2017, Market Village remains in operation with no signs of closure, but some long term tenants have left including McDonald's in late 2015. As of March 2017, certain stores have started selling off all inventory with sales staff mentioning the reason as store closing due to demolition work slated to begin September 2017.

The Remington Centre will have a contemporary design and unique features, including light-filled hallways, indoor and outdoor public spaces and signature night market.

In 2009, plans were developed to demolish Market Village and replace it with a larger and modern complex called the Remington Centre. It will feature a two level structure with over 800,000 square feet (74,000 m2) of retail and commercial space and two condo towers located on the southeast end. The Remington Centre will aim for LEED status along with the installation of 1100 tonnes of geothermal capacity. It is unknown when the mall will be constructed and completed due to several delays.

Coordinates: 43°49′31.8″N 79°18′12.6″W / 43.825500°N 79.303500°W / 43.825500; -79.303500


...
Wikipedia

...