Atlantis arrives at the ISS
|
|
| Mission type | ISS assembly |
|---|---|
| Operator | NASA |
| COSPAR ID | 2002-047A |
| SATCAT no. | 27537 |
| Mission duration | 10 days, 19 hours, 58 minutes, 44 seconds |
| Distance travelled | 7,200,000 kilometres (4,500,000 mi) |
| Orbits completed | 170 |
| Spacecraft properties | |
| Spacecraft | Space Shuttle Atlantis |
| Launch mass | 116,538 kilograms (256,922 lb) |
| Landing mass | 91,390 kilograms (201,480 lb) |
| Payload mass | 12,572 kilograms (27,717 lb) |
| Crew | |
| Crew size | 6 |
| Members |
Jeffrey S. Ashby Pamela A. Melroy Piers Sellers Sandra H. Magnus David A. Wolf Fyodor N. Yurchikhin |
| Start of mission | |
| Launch date | 7 October 2002, 19:45:51 UTC |
| Launch site | Kennedy LC-39B |
| End of mission | |
| Landing date | 18 October 2002, 15:44:35 UTC |
| Landing site | Kennedy SLF Runway 33 |
| Orbital parameters | |
| Reference system | Geocentric |
| Regime | Low Earth |
| Perigee | 273 kilometres (170 mi) |
| Apogee | 405 kilometres (252 mi) |
| Inclination | 51.6 degrees |
| Period | 91.2 minutes |
| Docking with ISS | |
| Docking port |
PMA-2 (Destiny forward) |
| Docking date | 9 October 2002, 15:16 UTC |
| Undocking date | 16 October 2002, 13:13 UTC |
| Time docked | 6 days, 21 hours, 57 minutes |
|
(L-R): Sandra H. Magnus, David A. Wolf, Pamela A. Melroy, Jeffrey S. Ashby, Piers J. Sellers and Fyodor Yurchikhin |
|
STS-112 (ISS assembly flight 9A) was an 11-day space shuttle mission to the International Space Station (ISS) flown by Space Shuttle Atlantis. Space Shuttle Atlantis was launched on 7 October 2002 at 19:45 UTC from the Kennedy Space Center's launch pad 39B to deliver the 28,000 pound Starboard 1 (S1) truss segment to the Space Station. Ending a 4.5-million-mile journey, Atlantis landed at 15:44 UTC on 18 October 2002 on runway 33 at the Kennedy Space Center's Shuttle Landing Facility.
During the launch, the ET bipod ramp shed a chunk of foam that caused a dent ~4" wide and 3" deep into the metal SRB-ET Attach Ring near the bottom of the left SRB. Prior to the next mission (STS-113), an upper-level decision was made at NASA to continue with launches as scheduled. The launch subsequent to that was the ill-fated STS-107.
Space shuttle Atlantis had been scheduled to visit the International Space Station (ISS) again on STS-114 mission in March 2003; however, due to the loss of Columbia, all space shuttles, including Atlantis, were temporarily grounded. Due to rescheduling of missions, Atlantis did not fly again until STS-115 on 9 September 2006.
The S1 truss segment, which provides structural support for the Space Station radiators was the main payload of STS-112 mission.