|
|||||||||||||||||||||||
|
|||||||||||||||||||||||
|
|||||||||||||||||||||||
|
|||||||||||||||||||||||
| Type and origin | |
|---|---|
| Power type | Diesel-electric |
| Builder | English Electric, Rocklea |
| Serial number | A.081-A.082, A.085-A.087 |
| Model | ST95B |
| Build date | 1964-1965 |
| Total produced | 5 |
| Specifications | |
|---|---|
| Configuration: |
|
| • AAR | B-B |
| • UIC | Bo-Bo, Bo′Bo′ |
| Gauge | 1,435 mm (4 ft 8 1⁄2 in) standard gauge |
| Loco weight | 73 t (72 long tons; 80 short tons) |
| Fuel type | Diesel |
| Prime mover | EE 6CSRKT |
| Aspiration | Turbocharged |
| Generator | EE 819/8F |
| Traction motors | EE 538 |
| Performance figures | |
|---|---|
| Maximum speed | 100 km/h (62 mph) |
| Power output | 710 kW (950 hp) |
| Career | |
|---|---|
| Operators | Western Australian Government Railways |
| Number in class | 5 |
| Numbers | H1-H5 |
| First run | 1965 |
| Current owner | SCT Logistics |
| Disposition | 3 in service, 1 stored, 1 scrapped |
The H class are a class of diesel locomotives built by English Electric, Rocklea for the Western Australian Government Railways in 1964-1965.
To assist with the conversion of the 657-kilometre (408 mi) Eastern Goldfields Railway from Perth to Kalgoorlie to standard gauge, five locomotives were purchased from built English Electric. After being shipped by sea from Rocklea, they were hauled on narrow gauge to Upper Swan with the first entering service in January 1965.
After the completion of the gauge conversion project they began to haul local freight and infrastructure trains. In October 1992, H4 was scrapped with the other used as shunters at Forrestfield until withdrawn in 1996. All were sold in 1997 to SCT Logistics for use as shunters at Dynon, Islington and Kewdale.