Line 8, Shenzhen Metro | |
---|---|
8 | |
Overview | |
Type | Rapid transit |
System | Shenzhen Metro |
Status | Under Construction |
Locale | Shenzhen, China |
Termini |
Liantang Yantian |
Stations | 6 |
Operation | |
Planned opening | 2020 |
Operator(s) | SZMC (Shenzhen Metro Group) |
Character | Underground and elevated |
Technical | |
Line length | 12.34 km (7.67 mi) |
Number of tracks | 2 |
Track gauge | 1,435 mm (4 ft 8 1⁄2 in) |
Line 8 Shenzhen Metro (Yantian Line)is currently under construction. Line 8 has a length of 12.34 km and a total of 6 stations. It connects the Liantang with Yantian. Line 8 is the first line to serve Yantian. The line may be built as a monorail rather than a traditional metro. Construction may start in 2016, with the line scheduled to open in 2020. This route is planned to connect with line 2, which indicates that train on line 2 will terminate at Yantian station.