| Line 5 Eglinton | |||
|---|---|---|---|
|
Promotional logo of the construction project
|
|||
| Overview | |||
| Type | Light rail | ||
| Status | Under construction | ||
| Locale | Toronto, Ontario, Canada | ||
| Termini |
Mount Dennis Kennedy |
||
| Stations | 25 (phase 1), 61 (phase 2) | ||
| Operation | |||
| Planned opening | 2021 | ||
| Owner | Metrolinx | ||
| Operator(s) | Toronto Transit Commission | ||
| Depot(s) | Black Creek Carhouse | ||
| Rolling stock | Flexity Freedom | ||
| Technical | |||
| Line length | 19 km (12 mi) | ||
| Track gauge | 1,435 mm (4 ft 8 1⁄2 in) standard gauge | ||
| Electrification | 750 V DC overhead | ||
| Operating speed | 80 km/h (50 mph) | ||
| |||