| Line 5 Eglinton | |
|---|---|
|
Promotional logo of the construction project
|
|
| Overview | |
| Type | Light rail |
| Status | Under construction |
| Locale | Toronto, Ontario, Canada |
| Termini |
Mount Dennis Kennedy |
| Stations | 25 (phase 1), 61 (phase 2) |
| Operation | |
| Planned opening | 2021 |
| Owner | Metrolinx |
| Operator(s) | Toronto Transit Commission |
| Depot(s) | Black Creek Carhouse |
| Rolling stock | Flexity Freedom |
| Technical | |
| Line length | 19 km (12 mi) |
| Track gauge | 1,435 mm (4 ft 8 1⁄2 in) standard gauge |
| Electrification | 750 V DC overhead |
| Operating speed | 80 km/h (50 mph) |