*** Welcome to piglix ***

Line 4 (Chongqing Rail Transit)

Line 4
 4 
Overview
Native name 重庆轨道交通4号线
Type Rapid transit
System Chongqing Rail Transit
Status Under construction
Locale Chongqing, China
Termini Min'andadao
Tangjiatuo
Stations 9
Line number 4
Operation
Planned opening August 2018 (2018-08)
Operator(s) Chongqing Rail Transit (Group) Co., Ltd.
Technical
Line length 15.6 km (9.7 mi)
Number of tracks 2
Track gauge 1,435 mm (4 ft 8 12 in)
Electrification 1500 V DC Overhead line
Route Map as of 2018
Jiazhou Rd.
 3 
Min'an Ave.
 Loop 
N. Square of Chongqing
N. Railway Station
Chongqing North Railway Station  10 
Toutang
 9 
Bonded Port
 9 
       
Bonded Port
 9 
Cuntan
Heishizi
Gangcheng
Taipingchong
Tangjiatuo Depot
Tangjiatuo
Ganbazi
Yuzui
Yumiao Rd.
Gaoshikan
Fusheng
Wangjiacheng
Shengjibao
Longxing
Gaoshita
Pufu
Tongzilin
Shichuan S.
Shichuan
Shichuan Depot
Wikipedia

...