Line 4 | ||||||
---|---|---|---|---|---|---|
4 | ||||||
Overview | ||||||
Native name | 重庆轨道交通4号线 | |||||
Type | Rapid transit | |||||
System | Chongqing Rail Transit | |||||
Status | Under construction | |||||
Locale | Chongqing, China | |||||
Termini |
Min'andadao Tangjiatuo |
|||||
Stations | 9 | |||||
Line number | 4 | |||||
Operation | ||||||
Planned opening | August 2018 | |||||
Operator(s) | Chongqing Rail Transit (Group) Co., Ltd. | |||||
Technical | ||||||
Line length | 15.6 km (9.7 mi) | |||||
Number of tracks | 2 | |||||
Track gauge | 1,435 mm (4 ft 8 1⁄2 in) | |||||
Electrification | 1500 V DC Overhead line | |||||
|