| Line 4 | ||||||
|---|---|---|---|---|---|---|
| 4 | ||||||
| Overview | ||||||
| Native name | 重庆轨道交通4号线 | |||||
| Type | Rapid transit | |||||
| System | Chongqing Rail Transit | |||||
| Status | Under construction | |||||
| Locale | Chongqing, China | |||||
| Termini |
Min'andadao Tangjiatuo |
|||||
| Stations | 9 | |||||
| Line number | 4 | |||||
| Operation | ||||||
| Planned opening | August 2018 | |||||
| Operator(s) | Chongqing Rail Transit (Group) Co., Ltd. | |||||
| Technical | ||||||
| Line length | 15.6 km (9.7 mi) | |||||
| Number of tracks | 2 | |||||
| Track gauge | 1,435 mm (4 ft 8 1⁄2 in) | |||||
| Electrification | 1500 V DC Overhead line | |||||
| ||||||