Line 10 | |||
---|---|---|---|
10 | |||
Overview | |||
Native name | 重庆轨道交通10号线 | ||
Type | Rapid transit | ||
System | Chongqing Rail Transit | ||
Status | Operational | ||
Locale | Chongqing, China | ||
Termini |
Wangjiazhuang Liyuchi |
||
Stations | 18 | ||
Line number | 10 | ||
Operation | |||
Opened | 28 December 2017 | ||
Operator(s) | Chongqing Rail Transit (Group) Co., Ltd. | ||
Technical | |||
Line length | 34 km (21 mi) | ||
Number of tracks | 2 | ||
Track gauge | 1,435 mm (4 ft 8 1⁄2 in) | ||
Electrification | 1500 V DC Overhead line | ||
Operating speed | 120 km/h (75 mph) (Peak) | ||
|