Loop line | |||
---|---|---|---|
Loop | |||
Overview | |||
Native name | 重庆轨道交通环线 | ||
Type | Rapid transit | ||
System | Chongqing Rail Transit | ||
Status | Under construction | ||
Locale | Chongqing, China | ||
Stations | 33 | ||
Line number | 0 | ||
Operation | |||
Planned opening |
September 2018 2020 (Northeastern Section) (Southwestern Section) |
||
Operator(s) | Chongqing Rail Transit (Group) Co., Ltd. | ||
Technical | |||
Line length | 51 km (32 mi) | ||
Number of tracks | 2 | ||
Track gauge | 1,435 mm (4 ft 8 1⁄2 in) | ||
Electrification | 1500 V DC Overhead line | ||
|