|
ORANGE LINE
|
|
|---|---|
|
Inbound train at Assembly on its opening day in September 2014
|
|
| Overview | |
| Type | Rapid transit |
| Status | Operational |
| Locale | Boston, Massachusetts |
| Termini |
Oak Grove Forest Hills |
| Stations | 20 |
| Daily ridership | 207,040 (2016) |
| Operation | |
| Opened | 1901 |
| Owner | MBTA |
| Operator(s) | MBTA |
| Rolling stock | 01200 series |
| Technical | |
| Line length | 11 miles (18 km) |
| Track gauge | 4 ft 8 1⁄2 in (1,435 mm) |
| Electrification | Third rail |